Showing posts with label BWSSB. Show all posts
Showing posts with label BWSSB. Show all posts

Saturday, December 25, 2021

Wrapping up the year at Puttenahalli Lake!

Yet again this year, Puttenahalli Puttakere taught us the importance of perseverance and the need to stay hopeful. When it seemed as if our 'trial by sewage' which had begun in 2017 would never end, BWSSB came through in April 2021 and plugged the leaks in the underground drain they had laid last year. The lake, as of now, is free of sewage. We pray that it stays this way!

Monsoon 2021. It seemed as if the southwest monsoon merged with the northeast and the rain would simply not cease. On the one hand, we wanted dry days that would allow BBMP to complete the lake cleaning, strengthening the bund, relaying the track, etc. On the other, we were delighted that the the sewage residue was getting diluted. However, the surface runoff had also brought in new invasive weeds. We'd battled with Salvinia molesta and realized that the pesky alligator weed had its uses. We now had to get rid of submerged weeds (Chara sp and Ottelia alismoides), emergent ones (water lily) as also the pervasive water lettuce (Pistia stratiotes) and others. Since birds need vegetation patches to shelter, nest and forage, we needed to leave enough for them. 

A little floor decoration
A little decoration

Gathering weeds with a trash boom
Gathering weeds with a trash boom

BBMP removing weeds 2021-07-09
BBMP removing weeds, 9-Jul-2021

Persicarea pulchra
Persicarea pulchra

Polygonum, Alternanthera
Polygonum, Alternanthera

In July and August, BBMP's workers along with our four gardeners were engaged in this but they had few sunny days and the weeds grew quickly. Nevertheless, the lake had rippling water but by November became a bed of green. Since the last one week, we have resumed clearing the water again. The almost immediate sighting of the Common Kingfisher is encouraging since it is found only where the water is clear.  We will control the weed growth even though the monsoon may bring in more next year. 

Common Kingfisher, 21-Dec-2021 (Pic: Satishchandra Karanth)

This confidence doesn't extend to knowing if the BBMP will renew our MoU  in the new year or if the authorities will take action to protect the lake premises from the encroachers at least in 2022. Both matters are sub-judice. 

Following BBMP's guidelines, the lake was closed for several months in 2020 due to the pandemic. This year it remained out of bounds for longer due to the repair work that seemed to go on and on. We are happy to tell you that from Wed, 22nd Dec., the lake has become accessible to the public once again. Timings are 6 a.m. to 10 a.m. and 4 p.m. to 6 p.m. Visitors, especially bird watchers, naturalists and photographers, have a treat in store. 

A royal Grey heron on the perch
A royal Grey Heron on the perch (Pic: SK Srinivas)

Seesaw for birds
Seesaw for birds (Pic: Ramu)

With footfall reducing, the lake has turned into a nursery. Chicks swimming with their parents is a common sight but we were taken aback to see five little black blobs on the walking track on 22nd Oct. Sunning themselves in the open were the chicks of the White-breasted Waterhen. And to think that the adult birds scuttle away at the sight of humans! 

White-breasted waterhen chicks
White-breasted Waterhen chicks, 22-Oct-2021 (Pic: Ramu)

Little Grebes "piggy backing" (Pic: Satishchandra Karanth)

We welcome you to visit and enjoy the natural treasures in Puttakere. Let's nurture the lake together as a rich ecosystem in the days, months and years to come. 

Wishing you and your family a Merry Christmas and a great new year. 

Best regards
PNLIT team

Friday, February 12, 2021

“Once there was a tank called Puttenahalli Puttakere….”

As many may have noticed, BBMP has been cleaning our little Puttenahalli Lake in J.P. Nagar 7th Phase, for nearly a month now. After ‘dewatering’ the lake, they began to remove the contaminated soil, from the surface in some places and further below at others.  A fortnight ago, these pits filled with black water and at other places, damp patches formed where weeds began to grow. The underground water was getting exposed by the digging we thought, but the patches became pools which grew in number and size. 

 

A LEAKING PIPE:



On 3rd February, our gardeners reported that water was entering the wetland through one of the inlet pipes which discharged surface runoff from South City. We contacted the apartment complex immediately. They checked and rechecked. This inflow wasn’t from South City.
 

Was this leakage from the newly installed UNDERGROUND DRAIN (UGD) that BWSSB had laid last year? 


The ward office sent a contractor to locate the source and plug it. By then, there was some seepage from below the inlet pipes as well. He suggested that we block the pipe with sandbags. The back flow would indicate possible source which could  be repaired. We did as he asked.

 

The sandbags remained in place and dry though the seepage from below the pipes increased as did the water level in the lake! In just four days, i.e., by Sunday 7th Feb., many of the pools had not only grown but, they and the trenches dug by the excavators had vile, floating mass which was visible from a distance. We knew only too well just what it was - sewage. Once again. 

 


THIS IS NOT THE FIRST TIME


In 2017, an occasional trickle of sewage from the UGD at Nataraja Layout began to enter the lake through the storm water drain. Each time, the BWSSB Ward Office removed the blockage with a jetting machine. When it became a regular feature, we escalated the issue to the Head Office, but no action was taken. The polluted water led to a massive fish kill in March 2018.



We desperately tried to alleviate the damage by installing an aerator fountain in April 2019. However, infuriated with the sewage overflowing on the road, the residents of the layout opened up the drain and led it directly into the lake on 3rd June 2019. Sewage started to gush inside. 

 


LAYING OF THE (NOW LEAKING) UGD:


In deep anguish, we were on the verge of giving up altogether when we appealed to Sri Jayaram, then Chairman, KSPCB and later at a meeting of the NGT Green Tribunal Committee chaired by Hon'ble Justice Sri Santosh Hedge. Sri Tushar Girinath, then Chairman of BWSSB who was present at this meeting agreed to get the existing UGD replaced with a bigger one but warned that the slum could be an obstruction.  Nevertheless, he kept his word and work began in August 2019.

 

Working between the sewage filled lake on the one side and the illegal houses on the other, progress was very slow. All the while, the slum dwellers kept a keen watch and, nervous for their safety, even picked up fights with the workers.

 

 

At the stretch where a few houses came in the way, BWSSB compromised by laying that section of the pipe on the REVETMENT on the water side. This exposed pipe developed cracks and the contractor’s patchwork repair gave way at least twice in January 2021. 

 


Now, not only was this section leaking yet again but along with it, the entire length of revetment along the new drain was damp and foul water was collecting to form pools. 

 

 


BWSSB responded at once to the alert and worked till the early hours on 11th Feb, to clear the blockage. They are still at it today. While we appreciate their prompt response, jetting or temporary measures will not do. They need to come up with a permanent solution if the lake is to be saved. 

 

COULD ALL THIS HAVE BEEN AVOIDED?


Yes. If only the government had acted on the Order of the Hon’ble High Court of Karnataka, passed on 7th March 2019 in W.P. Nos. 5073 – 5187 / 2015 (GM –RES).  These Writ Petitions filed by the slum dwellers were disposed of with a direction to (1) Principal Secretary (Revenue), (2) Deputy Commissioner and (3) Slum Board to take a decision on the slum dwellers’ representations (to the Deputy Commissioner on 23.09.2014) where they asked for allotment of individual plots instead of the temporary sheds already built for them by the Slum Board (and which they demolished in July 2018).

 

The Court gave twelve weeks’ time to the Respondents. On the 7th of March, next month, it would be two years since the High Court passed the order. The authorities concerned are yet to take any decision.

 

Time and again, we reminded them of the High Court order and the urgency for early action, given the sewage inflow. Frustrated at the Respondents passing the buck from one to another, we met the Additional Chief Secretary (Urban Dev.), the Chief Secretary (twice) and emailed the Chief Minister of Karnataka. In Jan 2020, we filed a case with the LOKAYUKTA to take action against the errant officials for dereliction of duty.  The next hearing is on 3rd March but, going by our past experience, we are fairly certain that the matter will get postponed further.  

 

HOW LONG CAN A BUND THAT IS ALREADY WEAK, HOLD UP, BEFORE ENDANGERING THE SLUM DWELLERS?


Way back in Sept 2017, we had alerted  BBMP and all the Respondents about the poor condition of the bund on the slum side. The inner grill had tilted in places and sections of it had fallen down.This happened because these residents had levelled the slope at many places to grow vegetables, fruit and flowers. In the process, they dislodged the boulders that were embedded on the bottom half of the revetment. On 28th May 2020, one of the houses on the bund collapsed and was quickly rebuilt. Since then, the bund has grown considerably weaker. The inner grill is almost nonexistent.


 

BBMP planned to strengthen the bund once the lake basin is cleared of the sewage sediment. With the UGD still leaking, and likely to do so in the future, what will they do now?

   

THE OUTCOME?


Our Puttenahalli Lake which looked this on 19/04/2019



Looks like this today, 12/02/2021



From 2010, working closely with the BBMP, residents from the neighbourhood and CSR partners, we toiled to bring a dry lake back to life. We overcame several obstacles on the way but 11 years later, the biggest two still remain – encroachment and sewage.


We have no words to describe our feelings at this point. If this situation continues we, and you, will soon have to say, “Once there was a tank called Puttenahalli Puttakere….”



PNLIT Trustees

Wednesday, October 14, 2020

Lake Update

It's been a while since we posted an update on the lake. So here goes. As you are aware, BWSSB arrested the inflow of sewage into the lake from 29th July. Since then BBMP has been attempting to strengthen the bund and clear the lake bed of the weeds. However, they are thwarted by the incessant rain. They, and we, are waiting for sunny days. At the same time, there's no denying that the plants are soaking in the rain and growing so lush! 

The lake is open to visitors between 7 a.m. and 10 a.m. and between 4 p.m. and 7 p.m. on all days except Sundays. Here are a few photographs taken by Ms. Raji Hari this morning. 







Birders like her update their list on the ebird site which shows 111 species. Most of them have been sighted after the lake was rejuvenated in 2010. We hope that with the BBMP giving a second lease of life to the lake, we will see even more species and numbers of birds in our lake. 

 

Saturday, May 30, 2020

Why do we even bother about Puttenahalli Lake?

It is with deep anguish that we are sharing the news of a house in the slum on our lake bund collapsing in the rain on the night of 28th May. Fortunately there was no loss of life or injury to anyone. 


House collapse, 28th March 2020
The Hindu, 30th March 2020
After seeing how extensively the slum dwellers had damaged the revetment by leveling the slope for their kitchen gardens and planting by the edge of the water, we had alerted the concerned authorities in Sept. 2017. The boulders had become dislodged, the walking track was uneven and sections of the inner grill had fallen down.  

We are particularly upset because this would not have happened if only the slum dwellers had shifted to the temporary sheds that the Karnataka Slum Development Board (KSDB) had built for them in 2014 at Bettadasanapura. By now, they would have been staying in 1bhk flats.

Rejecting the temporary accommodation as too small, they had filed a writ petition in February 2015 in the High Court asking for 20 feet x 30 feet sheds or individual plots of land. However, this didn't stop them from taking possession of the sheds on 24.02.2017 even though they continued to stay at the lake premises. When the matter was in the court, they razed 114 out of 118 sheds to the ground in July 2018. KSDB filed an FIR at the Bettadasanapura police and left it at that. We learnt about this after reading a report in the newspaper.

Deccan Herald, Sep 2018
The High Court disposed of the writ petition on 07.03.2019 with a directive to Respondent 1 - Principal Secretary (Revenue), Respondent 2 - Deputy Commissioner (Urban) and Respondent 3 - Karnataka Slum Development Board that they "shall take a decision on the representations of the petitioners in accordance with law in an expedite manner in any event, not later than twelve weeks from the date of receipt of the certified copy of the order. The petitioners shall not be evicted from the property in question till the decision is taken by respondent Nos.1 to 3.”   

We personally handed over the certified copy of the judgement to each of the respondents and reminded them every so often about this order. The 12 weeks stretched to 14 months, the Respondents have still not acted on the judgment. Emboldened perhaps by this, by the fact that the Slum Board did not pursue the FIR at the Bettadasanapura police station, and by the direction in the judgement, the slum dwellers refused to cooperate with BWSSB and BBMP to complete the underground drain and divert raw sewage entering the lake. 

With some six or seven houses built right next to the pathway above the drain, BWSSB was constrained to lay a new line a few feet above the water (photo attached). 

On 11th June 2020, PNLIT will complete 10 years as custodians of Puttenahalli Puttakere. What have we achieved in these many years? 

  • We are the first citizens' group to sign an MoU with the BBMP and become official custodians of a lake in Bengaluru. 
  • We have encouraged others, individuals and RWAs, to become lake warriors. 
  • With permission from KSPCB filled the lake with treated water from an apartment complex.
  • Introduced a low cost water purification model with our Artificial Floating Islands that have since been introduced in some other lakes. 
  • Installed an aerator fountain in April 2019.
  • The once dry periphery of the lake now has rich green cover with  trees, shrubs and climbers.
  • Since 2010, the  lake has attracted over 100 birds (ebird link), insects, reptiles and more. 
  • Butterflies are swarming at the lake even as we write this.  

Aerial view, January 2020
Yet, when we look back we see the misery of a collapsed house, sewage killing the lake and weeds growing rampantly. 

Aerial view, May 2020

What we feel is the burden of challenges that seem insurmountable even after striving so hard to resolve them. And now, the deep worry that no more houses should collapse in the days to come.  

Ten years later, we are left with these questions:

If the government is not interested in protecting lakes, why do we worry about Puttenahalli Lake?

If they will not follow a High Court judgement, why will they listen to us, ordinary folks trying to save a lake in the neighbourhood? 

Why, indeed, should we bother about Puttenahalli Lake?


Saturday, March 14, 2020

Update on Puttenahalli Lake revival

Happy to report that both BBMP and BWSSB are hard at work at our Puttenahalli Lake. BBMP has pumped out most of the water and are now getting trenches dug to drain the pools. Following this, they will begin removing some of the silt and muck from the basin, desilt the wetland, strengthen the bund, etc., etc. 

Trenches being made in lake bed to drain water

BWSSB has begun laying pipes for the underground drain. It is slow work since they are drilling deep into and along the ground taking care to ensure that the adjoining houses in the slum are not disturbed. Once they are done, sewage will be diverted into the new drain. At last!
Underground drain pipes being laid

Pipe welding

We are keeping our fingers crossed for BWSSB and BBMP to  work smoothly. If they are able to follow their schedule, the lake will be ready for a new beginning with the monsoon. 

We are excited about starting afresh too. For, in these ten years, it was not only the lake that evolved but our understanding of its ecosystem as well. With the lessons we have learned, we look forward to carry out new plans to make the lake and the surroundings even more attractive to birds, butterflies, insects, tortoise, turtles and what have you.

As we embark on this new journey, here's an opportunity to join us and share the wonderful experience of bringing the lake back to life once again. What can be greater than serving and connecting with nature? That too, in your neighbourhood? 

We need volunteers and funds. Please contribute generously to our ongoing donation drive. You can make your payment by Cheque (favouring 'PNLIT") or by direct remittance. For guidelines, see http://www.puttenahallilake.in/how-to-donate  Donations to PNLIT are eligible for 80G IT exemption.   

Best regards,
PNLIT Team


Friday, August 23, 2019

Update on the slum relocation

In our message of 21st August, we had informed you on the action taken by the BWSSB on the sewage issue. This one is to give you the update on the slum rehabilitation front. 

As you are aware, on 7th March 2019, the Hon'ble High Court had disposed of the Writ Petition filed by the slum residents with a directive to the Principal Secretary (Revenue), Deputy Commissioner (Urban) and the Karnataka Slum Development Board that they rehabilitate them "providing minimum facilities and amenities." Closure of WP 
To ensure that the government takes a decision before the deadline of 21st June 2019, we had followed up the matter with the Respondents themselves or with senior officials in these departments. When the deadline passed without any action being taken, we had no alternative but to seek the intervention of the Chief Secretary, Govt. of Karnataka. Mr. Vijaya Bhaskar was kind enough to meet us yesterday, 22nd August in his office.
The Chief Secretary then spoke on the telephone to Mr. Balraj, Technical Director, Slum Board, about their plan to rehabilitate the slum dwellers. He has instructed them to follow the court order and initiate construction of the apartments for the slum dwellers.
We then went to the Slum Board and met Mr. Kumar Easwar, AEE. The KSDB has already drawn the DPR for the apartments. They expect the housing units in three floors (G + 2), 1BHK, size 300 sq. ft to be ready for occupation in another 16 months.
Four years ago, the Slum Board had built temporary sheds at the same site in Bettadasanapura. The slum residents had rejected these as being too small and had filed the Writ Petition in the High Court seeking individual plots of land for each of the 115 petitioners. In Feb. 2017, they had taken possession of the sheds but continued to stay in the lake premises. In July 2018, they razed the sheds to the ground.
We fervently hope that they accept these apartments and not destroy or damage them in any way. Nor, for that matter file another Writ Petition!
With fingers crossed,
PNLIT team  

Wednesday, August 21, 2019

Update on the sewage inflow issue at the lake

Exactly a month ago, we had informed you about sewage killing our lake (link) and the illegal hutments coming in the way of the drain pipe replacement. Many of you had shared deep concern about this and offered all help. Indeed, your response to our online petition was heartwarming and the number of signatures in this short span is close to the 4000 mark. Sincere thanks to each one of you. You must be eager to know what happened to these two issues - hence this update. 

There is no progress on the rehabilitation of the slum residents. However, on 31st July, we had brought the sewage inflow to the notice of the NGT committee headed by Justice Santosh Hegde. BWSSB Chairman, Mr. Tushar Girinath, who was present at this meeting committed to get it resolved. He kept his word and a week later, replacement pipes were unloaded at the lake. The BWSSB officers began work after reassuring the slum residents that all care would be taken not to damage any of their structures.

Their progress is slow, impeded not only by the houses so close by but also by the rain and the already weak bund. Hence, they are not able to indicate when the work will be completed and when the sewage will begin to flow into the drain. We are also not certain how they will tackle that section in the middle where the houses are built right next to the walkway with the UGD running below. Nonetheless, we are grateful to the BWSSB Chairman, the Chief Engineer (WWM) and the ward officers. To everyone working on the site - good luck and godspeed!   




(Pics: Ramu, one of our gardeners)

The rain which is helping to dilute the sewage also increased the level and led to the lake overflowing yesterday. 

Overflowing (Pic: Ramu)
Lifting our spirits further and adding a bright dash of colour to the grey sky are the deep red flowers of the Cup and Saucer plant and vibrant yellow of the Gaphimia flowers on the chain link fence. They make us marvel, yet again, on the beauty of Nature. 

Cup and Saucer plant (Pic: Rashmi, our manager)

Gaphimia (Pic: Rashmi, our manager)

Heartfelt thanks to you again for your support. 

Best regards
PNLIT team

Monday, July 22, 2019

Requiem for our Puttenahalli Lake

It is with the deepest anguish and helplessness that I write this - our Puttenahalli lake is dying. 

Our lake had clear rippling water a few months ago. Surrounded with lush vegetation, it had become a rich ecosystem and home to several species of birds. It was the walkers’ delight, venue for our year round environment awareness programmes for the community. All these may cease to exist.  

24th April 2019

As our long time associates, donors, volunteers, child participants and residents, we owe it to you to explain why and how a lake that was a model for others in the city should suddenly be in such dire straits. Hence this detailed mail:

Simply put, raw sewage from Nataraja Layout is killing our lovely lake. A year or so ago when it was still a trickle we had alerted BWSSB, BBMP and KSPCB. See update on sewage situation May 2019.  On 3rd June 2019, the residents of Nataraja Layout got fed up of the underground drain constantly overflowing onto the road. They opened up the drain to direct the sewage into our lake. Raw sewage began to gush into the wetland. 

16th Jun 2019, lull before the storm, sewage restricted to the wetland

We raised a red alert with the authorities. The Chief Engineer, Waste Water Management, BWSSB informed us that they had completed the procedure to replace the existing drain with a bigger one and issued a work contract. However, this had been stalled because the underground drain from Nataraja Layout  enters the lake premises below the walking track on the south east. The encroachers on the lake bund have built their houses and shops right along the length of the pathway.

As you are already aware, these encroachers had filed a writ petition in the High Court of Karnataka seeking for sites to be allocated to them, and not be disturbed from the lake bund in the meantime. On 7th March 2019, the Hon'ble High Court of Karnataka disposed of the Writ Petition filed by the encroachers with a directive to Principal Secretary (Revenue), Deputy Commissioner (Urban) and the Karnataka Slum Development Board that "Respondent Nos.1 to 3 shall take a decision on the representations of the petitioners in accordance with law in an expedite manner in any event, not later than twelve weeks from the date of receipt of the certified copy of the order. The petitioners shall not be evicted from the property in question till the decision is taken by respondent Nos.1 to 3.”  Closure of WP

We had personally handed over a certified copy of the judgement on 22nd March 2019 to the Respondents. Since then, we had followed it up with reminders (letters, emails, whatsapp messages) and personal meetings with them or their senior officers. We apprised them of the sewage situation and urged them to take an early decision.

The Principal Secretary (Revenue) called for a meeting a day before the 12 week time granted by the High Court was to come to an end.  At this meeting on 20th June, it was decided that the Slum Board should take a decision in this regard. 

On 4th July, we met the Commissioner, Karnataka Slum Development Board who said that their role is restricted to recognised slums and the one on our lake bund is not a "Recognised Slum". They are encroachers and that the Karnataka Tank Conservation and Development Authority would be able to get them relocated. He spoke to the Deputy Secretary, KTCDA and instructed his Assistant Engineer to meet the DS (Deputy Secretary) at Vikasa Soudha after 3 p.m. that day. We insisted on accompanying the AE and met the DS who said he would write to the Revenue Dept. to remove the encroachers from the lake bund. The wheel had turned a full circle! 

The  Deputy Secretary, KTCDA  asked the AE to give a letter from the Commissioner, Slum Board stating the facts. He had wanted this letter to be given without delay. However, even after two weeks, the Slum Board is yet to do so.

The court deadline of 21st June has passed. One of the Respondents had told us bluntly, “No one wants to bell the cat.” This is the last nail on the coffin.

The quantum of sewage is such that it is now flowing over the wetland bund into the main lake. Our Artificial Floating Islands have long been rendered useless. The treated water from South City and the fountain we installed this April are fighting a losing battle. Nevertheless, BBMP (Lakes) and BWSSB are trying to find alternate solutions to divert the sewage. Even if they come with any, we fear, it would be too late for our Puttenahalli Lake.

18th Jul 2019, sewage gushing

18th Jul 2019, sewage overflowing from wetland into main lake

The average of samples taken from five different points and the reading in the wetland (where the sewage enters the lake) for January and June 2019 highlight the deterioration in the quality of the water. 

January 2019 
Average: 5.22 mg/lt; 
Wetland: 4.7 mg/lt;

June 2019
Average: 2.9 mg/lt; 
Wetland: 1.7 mg/lt;
Many of you have seen for yourselves the evolution of the lake from a garbage dump to one full of life. As our partner, you know that this transformation had taken us several years to achieve. Its degradation is swift. 

If the sewage inflow is not stopped immediately, Puttenahalli lake may soon become one more lake in Bengaluru killed as much by government apathy as by the pollutants.  

In sorrow, helplessness and anger,

Usha